ADS5474IPFP | ||
---|---|---|
|
||
|
||
产品描述:
Analog to Digital Converters - ADC 14B 400 MSPS
|
||
标准包装:96 | ||
数据手册: |
PCN Assembly/Origin | Qualification Mold Compound 30/Sep/2014 |
---|---|
Architecture | Pipelined |
Sampling Rate (Per Second) | 400M |
Number of A/D Converters | 1 |
Packaging | Tray |
Data Interface | LVDS, Parallel |
For Use With | 296-30662-ND - EVAL MODULE FOR ADS5474 |
Reference Type | Internal |
Online Catalog | 14 Bit |
Family | Data Acquisition - Analog to Digital Converters (ADC) |
Operating Temperature | -40°C ~ 85°C |
Voltage - Supply, Analog | 5V |
Product Training Modules | Data Converter Basics |
Ratio - S/H:ADC | 1:1 |
Voltage - Supply, Digital | 3 V ~ 3.6 V |
Input Type | Differential |
Package / Case | 80-TQFP Exposed Pad |
Supplier Device Package | 80-HTQFP (12x12) |
Configuration | S/H-ADC |
Number of Inputs | 1 |
Number of Bits | 14 |
RoHS | Lead free / RoHS Compliant |
数据手册: |
---|
Supplier Code:SP1028
Offline Manufacture or Manufacture authorized supplier owned stock and price , need double confirmation and share out from them
See more prices
1+ | $454.8444 |
---|---|
2+ | $450.1417 |
3+ | $448.57465 |
4+ | $447.79035 |
5+ | $447.3207 |
7+ | $446.78285 |
13+ | $446.16285 |
stock | 58 | Update On 2025-05-12 |
---|---|---|
Lead-Time | -- | |
Supplier SPQ/MOQ | 96/1 | |
Location | -- | |
DateCode | -- |
Supplier Code:SP1034
Offline Manufacture or Manufacture authorized supplier owned stock and price , need double confirmation and share out from them
stock | 5 | Update On 2025-06-04 |
---|---|---|
Lead-Time | -- | |
Supplier SPQ/MOQ | 1/1 | |
Location | -- | |
DateCode | -- |
Supplier Code:SP1034
Offline Manufacture or Manufacture authorized supplier owned stock and price , need double confirmation and share out from them
2+ | $433.66054 |
---|---|
10+ | $424.98694 |
stock | 5 | Update On 2025-06-04 |
---|---|---|
Lead-Time | -- | |
Supplier SPQ/MOQ | 1/2 | |
Location | -- | |
DateCode | -- |
Supplier Code:SP1027
Offline Manufacture or Manufacture authorized supplier owned stock and price , need double confirmation and share out from them
stock | 2 | Update On 2025-05-12 |
---|---|---|
Lead-Time | 18Weeks | |
Supplier SPQ/MOQ | 96/1 | |
Location | -- | |
DateCode | 2117 |
请输入下方图片中的验证码: