BAT54CTT1G | ||
---|---|---|
|
||
|
||
Product description : BAT54CTT1 Series 30 V 600 mA Surface Mount Dual Schottky Barrier Diode - SC-75 | ||
SPQ:3000 | ||
Datasheet : |
Supplier Device Package | SC-75, SOT-416 |
---|---|
Operating Temperature - Junction | -55°C ~ 125°C |
Part Status | Active |
Speed | Small Signal =< 200mA (Io), Any Speed |
Manufacturer | ON Semiconductor |
Current - Reverse Leakage @ Vr | 2µA @ 25V |
Mounting Type | Surface Mount |
Diode Configuration | 1 Pair Common Cathode |
Packaging | Cut Tape (CT) |
Package / Case | SC-75, SOT-416 |
Current - Average Rectified (Io) (per Diode) | 200mA (DC) |
Diode Type | Schottky |
Category | Discrete Semiconductor Products |
Reverse Recovery Time (trr) | 5ns |
Family | Diodes - Rectifiers - Arrays |
Voltage - DC Reverse (Vr) (Max) | 30V |
Voltage - Forward (Vf) (Max) @ If | 800mV @ 100mA |
ECCN | EAR99 |
Datasheet: |
---|
Supplier Stock
Offline Manufacture or Manufacture authorized supplier owned stock and price , need double confirmation and share out from them
stock | 231000 | Update On 2025-05-20 |
---|---|---|
Lead-Time | -- | |
SPQ/MOQ | 3000/3000 | |
Location | -- | |
DateCode | 2445 |
Supplier Code:SP1034
Offline Manufacture or Manufacture authorized supplier owned stock and price , need double confirmation and share out from them
200+ | $0.05782 |
---|---|
800+ | $0.05602 |
1600+ | $0.05435 |
stock | 2200 | Update On 2025-05-21 |
---|---|---|
Lead-Time | -- | |
Supplier SPQ/MOQ | 1/200 | |
Location | -- | |
DateCode | -- |
Supplier Code:SP1034
Offline Manufacture or Manufacture authorized supplier owned stock and price , need double confirmation and share out from them
800+ | $0.05602 |
---|---|
1600+ | $0.05435 |
stock | 2200 | Update On 2025-05-21 |
---|---|---|
Lead-Time | -- | |
Supplier SPQ/MOQ | 1/800 | |
Location | -- | |
DateCode | -- |
Supplier Code:SP1027
Offline Manufacture or Manufacture authorized supplier owned stock and price , need double confirmation and share out from them
3000+ | $0.05596 |
---|---|
9000+ | $0.04294 |
stock | 24000 | Update On 2024-11-30 |
---|---|---|
Lead-Time | 13Weeks | |
Supplier SPQ/MOQ | 3000/3000 | |
Location | -- | |
DateCode | 2426 |
Please enter the verification code in the image below: