SMAJ58A-TR | ||
---|---|---|
|
||
|
||
Product description : SMAJ Series 400 W 58 V Uni Directional SMT TVS Diode - DO-214AC | ||
SPQ:1 | ||
Datasheet : -- |
Power - Peak Pulse | 400W |
---|---|
Type | Zener |
Power Line Protection | No |
Other Related Documents | SMAJ View All Specifications |
Current - Peak Pulse (10/1000µs) | 19A (8/20µs) |
Series | SMAJ, TRANSIL™ |
Unidirectional Channels | 1 |
Applications | General Purpose |
Voltage - Reverse Standoff (Typ) | 58V |
RoHS | Lead free / RoHS Compliant |
Package / Case | DO-214AC, SMA |
Supplier Device Package | SMA (DO-214AC) |
Voltage - Clamping (Max) @ Ipp | 121V |
Online Catalog | Transil™ SMA4F, SMAJ, SMM4F, SMX1J Series |
Voltage - Breakdown (Min) | 64.4V |
Family | TVS - Diodes |
Mounting Type | Surface Mount |
Operating Temperature | -55°C ~ 150°C (TJ) |
Packaging | Tape & Reel (TR) |
Supplier Stock
Offline Manufacture or Manufacture authorized supplier owned stock and price , need double confirmation and share out from them
stock | 75000 | Update On 2025-05-27 |
---|---|---|
Lead-Time | -- | |
SPQ/MOQ | 1/1 | |
Location | -- | |
DateCode | -- |
Supplier Code:SP1034
Offline Manufacture or Manufacture authorized supplier owned stock and price , need double confirmation and share out from them
5000+ | $0.08952 |
---|---|
10000+ | $0.08687 |
20000+ | $0.08423 |
stock | 33125 | Update On 2025-05-21 |
---|---|---|
Lead-Time | -- | |
Supplier SPQ/MOQ | 1/5000 | |
Location | -- | |
DateCode | -- |
Supplier Code:SP1034
Offline Manufacture or Manufacture authorized supplier owned stock and price , need double confirmation and share out from them
1250+ | $0.22768 |
---|---|
2500+ | $0.22087 |
stock | 33125 | Update On 2025-05-21 |
---|---|---|
Lead-Time | -- | |
Supplier SPQ/MOQ | 1/1250 | |
Location | -- | |
DateCode | -- |
Supplier Code:SP1034
Offline Manufacture or Manufacture authorized supplier owned stock and price , need double confirmation and share out from them
25+ | $0.23491 |
---|---|
1250+ | $0.22768 |
2500+ | $0.22087 |
stock | 200 | Update On 2025-05-21 |
---|---|---|
Lead-Time | -- | |
Supplier SPQ/MOQ | 1/25 | |
Location | -- | |
DateCode | -- |
Please enter the verification code in the image below: