MMBZ5242BLT1G | ||
---|---|---|
|
||
|
||
Product description : MMBZ5242BL Series 225 mW 10 mA 12 V SMT Zener Voltage Regulator - SOT-23-3 | ||
SPQ:3000 | ||
Datasheet : -- |
Vz - Zener Voltage: | 12 V |
---|---|
Packaging: | Reel |
Manufacturer: | ON Semiconductor |
Series: | MMBZ5242B |
Minimum Operating Temperature: | - 65 C |
Brand: | ON Semiconductor |
RoHS: | Details |
Package / Case: | SOT-23 |
Zz - Zener Impedance: | 30 Ohms |
Height: | 0.94 mm |
Unit Weight: | 0.007090 oz |
Mounting Style: | SMD/SMT |
ECCN | EAR99 |
Length: | 2.9 mm |
Width: | 1.3 mm |
Zener Current: | 10 mA |
Pd - Power Dissipation: | 300 mW |
Factory Pack Quantity: | 3000 |
Ir - Reverse Current: | 1 uA |
Termination Style: | SMD/SMT |
Product Category: | Zener Diodes |
Voltage Tolerance: | 5 % |
Configuration: | Single |
Type: | Voltage Regulator |
Maximum Operating Temperature: | + 150 C |
Supplier Stock
Offline Manufacture or Manufacture authorized supplier owned stock and price , need double confirmation and share out from them
stock | 456000 | Update On 2025-09-23 |
---|---|---|
Lead-Time | -- | |
SPQ/MOQ | 3000/3000 | |
Location | -- | |
DateCode | 2438 |
Supplier Code:SP1038
Offline Manufacture or Manufacture authorized supplier owned stock and price , need double confirmation and share out from them
stock | 806 | Update On 2024-04-21 |
---|---|---|
Lead-Time | -- | |
Supplier SPQ/MOQ | 1/1 | |
Location | -- | |
DateCode | 2224 |
Supplier Code:SP1036
Offline Manufacture or Manufacture authorized supplier owned stock and price , need double confirmation and share out from them
1+ | $0.10215 |
---|---|
200+ | $0.0341 |
1500+ | $0.02138 |
stock | 2897 | Update On 2024-04-21 |
---|---|---|
Lead-Time | -- | |
Supplier SPQ/MOQ | 3000/1 | |
Location | -- | |
DateCode | -- |
Supplier Code:SP1027
Offline Manufacture or Manufacture authorized supplier owned stock and price , need double confirmation and share out from them
See more prices
3000+ | $0.03286 |
---|---|
9000+ | $0.031 |
24000+ | $0.02279 |
99000+ | $0.02124 |
stock | 90000 | Update On 2024-04-21 |
---|---|---|
Lead-Time | 43Weeks | |
Supplier SPQ/MOQ | 3000/3000 | |
Location | -- | |
DateCode | 2239 |
Please enter the verification code in the image below: